Price List for Engineering Services

Project type   Price, in BGN per sq. ft., w/o VAT
1,000 ft2 3,000 ft2  3,001 ft2 7,500 ft2 7,501 ft2 16,000 ft2 16,001 ft2 30,000 ft2
PRICES FOR DESIGNING POWER SUPPLY SYSTEMS
Power electrical system 0.30 0.20 0.16 0.10
Uninterruptible Power Supply System 0.10 0.08 0.06 0.05
Grounding and lightning protection 0.04 0.03 0.02 0.02
Smart Home system 0.35 0.25 0.15 0.10
 
PRICES FOR DESIGNING LOW-CURRENT SYSTEMS
Building automation system (BMS) 0.20 0.15 0.10 0.08
Audio-video multiroom system 0.13 0.10 0.07 0.05
Local Area Network System 0.08 0.06 0.05 0.03
Terrestrial and satellite television system 0.08 0.06 0.05 0.03
Leakage protection system 0.07 0.05 0.04 0.03
Intercom system 0.07 0.05 0.04 0.03
Burglar and intrusion alarm system 0.07 0.05 0.04 0.03
Fire alarm system 0.07 0.05 0.04 0.03
Video surveillance system (CCTV) 0.07 0.05 0.04 0.03
Telecom cabinet (layout, allocation) 0.04 0.03 0.02 0.02
 
PRICES FOR ENGINEERING PROJECTS
Automation, dispatching, accounting project 0.55 0.25 0.15 0.10
Technological process automation 0.55 0.25 0.15 0.10
Master plan of internal engineering networks 0.55 0.10 0.07 0.05
Master plan engineering networks 0.09 0.08 0.06 0.05
 
PRICES FOR OTHER DESIGN WORKS
Development of technical specifications 0.08 0.06 0.03 0.02
Automatic fire extinguishing 0.07 0.06 0.04 0.03
Author's supervision (per site) 0.50 0.38 0.33 0.25
 
PRICES FOR DESIGN WORKS DURING RECONSTRUCTION
Technical conclusion, system surveys 0.35 0.25 0.15 0.10
Bureau of Technical Inventory plans 0.09 0.08 0.06 0.05
Reconstruction, design complexity 0.15 0.10 0.07 0.05
 
ATTENTION !
*all prices are indicated excluding the cost of materials
All prices in Bulgarian levs (BGN) and w/o VAT  
The price list is valid from Jun 15, 2021  
Minimum order value     25.00 BGN
Bogus Call     15.00 BGN
Downtime due to the fault of the customer, per hour 25.00 BGN